Merry Saba

Merrylands
JAN 2019

Demolition of existing structures
Bored Shore Piles 610m
Bulk Excavation in rock 10,500m³
Detail Excavation of 150m³ incl. pad footings, crane base and lift shafts
Shotcrete and Anchors
Capping Beam